7pcs plastic Vinyl Strap Israel lovely design Leisure Furniture Outdoor Dining Set
Quick Details
Specific Use: Garden Furniture /Patio Furniture / Leisure Furniutre / Outdoor Family Party
Brand Name: Boomfortune, with you together!
Product Name: 7pcs plastic Vinyl Strap Outdoor Dining Set with padded cushion
Color: White Green stripes /Customized
Cushion: 8cm padded cushion, waterproof
Keywords: Outdoor dinning set/Garden dining set/Patio dining set / Resorts furniture
Production capacity: 1000 sets one month
Quality Assurance: full inspection during the production
General Use: Outdoor/Terrace Villas/Countyard/Restaurant / family party outdoor
Place of Origin: Hebei, China
Style: Middle Easy Modern outdoor furniture
Application: Garden/Patio/Balcony/Cafe/Restaurant/Indoor
Constructure: KD table/Stacking chair
Main Material: Steel/Vinyl/Glass
Shipping time: 45 days after buyer order confirmation
Payment terms: 30% deposit through transfer, Balance to be settled after submitting BL copy
Features
Stackable chairs made of vinyl strap weaving and powder coated steel frame
Powder coated steel frame is rustproof, all-weather use
KD construction on table, 5mm water-wave tempered glass included
Polyester waterproof fabric and 8cm thickness on cushion matched for each chair
Weight Capacity: 120kgs on seat, and 50kgs on table
Dark green frame and green white strip fabric color creat the “green” products
Characters
Sku Model Number | BF-CT703 |
Applied For | Patio, restaurant,garden, terrace |
Main material and Specifications | 7pcs steel vinyl strap patio dining sets with waterproof cushions 1) chair armrest:42*14*0.8mm; seat/back: Dia25mm; Table: legs 42*14*0.8mm 2) 8cm cushion pad with bands 3) 180g polyester fabric waterproof cushion covers with zip, 5cm thickness 4) 5mm tempered glass; |
Product Dimension | Chair: W55*D68*H93cm |
Table: L150*D90*H70cm | |
Warranty /guarantee | 2 years on construction, 1 years rust-proof outsiide |
Packing Methods: | chairs: packed by 25pcs/stack; table: 1pc/carton |
Loading Ability /container | 100 sets/40FT container |
MOQ | 100 sets; |
Production Lead time | 30-45 days in slack season and 60-75 days during peak production season |